Wednesday, 22 October 2008

Surgery in Richard's Bay

The Surgery in Richard's Bay is underway with the space being stripped of all fittings, brick walls being demolished and ceilings and drywall removed from site.

It is now a race against time to get the furniture and shopfitting manufactured, new drywalling, ceilings, flooring and all fittings installed by the end of November.


This very daunting task is being rather hampered by slow quoting by the various contractors making the finalising of the client's budget very difficult.

So things at Jossi Design are rather stressful right now, and I know it is the same with all the designers at this time of year, as deadlines are tight and the pressure is on. It is therefore all-systems-go till builder's shutdown and then we can relax over the Christmas Holidays.