The cocktail bar is an exciting project as it is an awesome space. High double volume industrial ceilings, large ground floor with an 8m long bar, outdoor area looking onto a canal with various arrangements of seating, a mezzanine level with DJ booth and smaller bar. The presentation meeting is due on Monday.
Doctor Marais offices are a week away from completion, snagging took place last week with all the contractors on site on Wednesday attending to the snags. House Delport is also due to be completed at the end of this month ready for the client to move in. Furniture is being made, as well as curtains, scatter cushions and fabric panels.
Jossi Design went to tender on the renovation of the offices on Musgrave Road, tenders are due in Friday of this coming week.
Sunday, 30 March 2008
Proceedure Room
The remaining furniture is due to arrive Monday, and then we can complete the finishing touches such as the signage panels, and the artwork and mirrors can be hung up on the walls. We are looking forward to seeing the end result of the surgery as a whole, hopefully by the end of this week.
Reception/ Waiting Area
At the same time, the kitchen is being installed on site in the La Lucia house. The wallnut kitchen is starting to take shape and the colour works so well with the travertine tiled floor. The built in cupboards are also on site but are yet to be positioned in the relevant bedrooms.
Kitchen installation La Lucia House
Tuesday, 25 March 2008
Offices on Musgrave Road, Durban
Sunday, 02 March 2008
Jossi Design Advertises
Jossi Design is also due to do a presentation for the various agents and professional team involved in Palm Lakes Estate to make them aware of our Interior Design and Decorating Services.
Another presentation that is currently being completed is for the Interior Design and Decoration of an office space on Musgrave Road. Craig and I met with the prospective clients this week and obtained the brief, we then spent the last half of the week completing the suggested layout of the space and putting this plan and suggested finishes and design into a powerpoint presentation. We are looking forward to the presentation and what is to follow thereafter.
Please look out for our advert due to come out 17th March in the Elle Decoration Magazine or visit our website http://www.jossi.co.za/
Sunday, 24 February 2008
House La Lucia Site Visit
Craig and I went to site this week, we had decided to take a walk around the see the progress that had been made over the past few weeks. The construction side has been moving slowly for a while now, but the ceilings have almost been complete. This is a very good thing as it brings a lot of proportion to the room now as high ceilings make the rooms look smaller than they actually are. By installing the lowered plasterboard ceilings and painting them white the room comes back into proportion.
I am very glad that the tiling has started and come as far as it has in the short amount of time since I was on site. This means that the messy work is almost over, the walls need to be painted and the house will start looking more like a house and less like a construction site. We have suggested wall colours and the builder has painted sample patches on the walls for approval.
Internal Staircase
Craig has been ordering the furniture this week, and the client has chosen some of her own items for the house and purchased these herself. This does make it more challenging from Jossi Design's side as co-ordination is a large part of our business in ensuring the client is happy with the end result. It seems that all is working out at the moment in terms of the furniture and the overall look, the concern today with the size of the carpet inlay should be easy to resolve with a site meeting. Unfortuntely, the size of the carpet inlay is very much determined by the positioning of th furniture and therefore the size of the furniture. As the furniture selection is still changing it is difficult to pin down exact sizes, but the use of additional tile borders should recitfy the proportions.
Bathroom Ceiling
Tip for the week: It can be extremely tempting to accept the cheapest quote, but very often you will find that you will "get what you pay for". I have seen so many cases where the cheapest quote is accepted only to result in time and money being wasted trying to retify the problems that result from the poor quality or workmanship. Get in a few quotes, this can take time waiting for the quotes to come in from the various companies, but at least you will be able to compare all the quotes and make an informed decision. If the one quote is far cheaper than all the others, then there is possibly something that has been left out or some corners have been cut.